So now we have multiple projects all going on at once. We have (1) adding lean-toos onto the big barn, (2) putting bolts and beams in the loft so a structural engineer blesses it, (3) concrete in the pole barn addition, (4) electrical in all barns, and (5) septic system. Here is the progress of the lean-toos:
Thanks to Sam, Ed, Mr and Mrs O for pushing hard to get these posts up, and this process started!
No comments:
Post a Comment